The Challenge:

 

During the Discovery phase, it became clear that the existing van set-up was limiting operational efficiency and on-site productivity.

​​​

  • Engineers were unable to run essential equipment such as 110V tools, restricting the scope of work they could complete on-site.

  • Multiple site visits were often required because vans could not carry the right combination of tools, stock, and equipment in one trip.

  • Limited and poorly organised load space meant stock often obstructed access to tools.

  • No effective solution for storing long ladders and managing paperwork within the vehicle.

  • Increased safety and security risks, particularly when vehicles were left running during works.

The overall impact was lost time, reduced productivity, and unnecessary operational cost.

Our Solution:

We developed two tailored vehicle specifications to reflect the different workflows across teams, ensuring each van was optimised for its real-world use.​

  • A fully integrated electrical system, enabling reliable 110V power for tools and improving on-site capability.

  • Internal and external lighting to extend safe working time and improve visibility in all conditions.

  • A bespoke internal rail system and high-level ladder storage to maximise load space without compromising accessibility.

  • A layered security solution, including reinforced locks and segregated load area access, reducing theft risk.

  • Enhanced safety features, including interior lighting, exterior work lights, amber strobes, and beacons.

  • A transformer-based 110V supply with retractable cable reel, giving engineers flexible and efficient power on site.​​​​

Durasto Logo

© 2025 by Durasto Ltd. Powered and secured by Wix

Head Office

Durasto Ltd

Blackhedge Farm

Leckhampton Hill

Cheltenham

GL53 9QJ

Contact Us​​

01242 371066

sales@durasto.com

  • LinkedIn
  • Instagram
  • YouTube
bottom of page