top of page
image.png

TT Pumps

Making life easier for the fleet manager while getting engineer input to shape a company-wide solution. 

DSC00521_edited.jpg
The Challenge:​​​

​

Having previously used different suppliers to complete different elements of their vehicle conversions. This created a multi-stage process that was longer, harder to coordinate, and extended time to complete. 

​

They needed a conversion partner who could simplify the process, understand the needs of the engineers using the vans, and create a practical set-up that supported their day-to-day work.

​

  • Being able to not only capture the needs of fleet manager but the practical details that matter to their engineers.

  • Needed an improved electrical set-up that could not only work for charging power tools but run microwaves off them. 

  • Better ways to store unique items such as tripods. 

​

Our Solution:​​​
  • Single point of contact throughout the project with video calls to fleet manager and engineers to understand both stakeholders needs and manage expectations. 

  • All elements of the conversion delivered in a 3-4 week period. 

  • Bespoke storage bins positioned practically for items such as spades and other site tools.

  • IP-rated socket fitted at the rear of the vehicle, allowing pumps to be powered with minimal trailing cables.

  • Racking layout reviewed and simplified to reduce cost while improving usable space and storage for awkward items. 

The Result:
Durasto Logo

© 2026 by Durasto Ltd. Powered and secured by Wix

Company No. 11299613 | VAT No. 298691432

Head Office

​

Durasto Ltd

Blackhedge Farm

Leckhampton Hill

Cheltenham

GL53 9QJ

Contact Us​​​

​

01242 371066

sales@durasto.com​

  • LinkedIn
  • Instagram
  • YouTube
bottom of page